Solar power for a 50 m Dubai advertising hoarding
Compare buying and renting solar storage against the diesel bill for a Dubai hoarding. Check lighting delivery, usable rear area and rent before signing.

Will the advertiser receive all paid lighting hours?
Meter the face, logo and auxiliaries separately. Agree the night schedule, brightness measurement points, response time and the credit for missed lighting. Use a time-stamped meter and an optical check at the face. Battery SOC alone cannot prove that the lamps came on.
Will the array fit on the permitted side?
80 kWp at 22% module efficiency needs about 364 m² of net module surface. Survey the usable back after access, shadows and setbacks. Obtain the landlord’s consent and structural sign-off. Dubai RTA §3.6 requires backlighting for its hoarding category. For a backlit face enter the measured AC load; external floodlights require an expressly eligible site.
What can overturn a diesel-free design?
In our Dubai replay, 14 × 600 W plus two 400 W logo supplies draw 9.2 kW. With 80 kWp facing south at 75° and four 261.248 kWh cabinets, changing continuous auxiliary draw from 0.25 to 1 kW changes zero to six hours with a shortfall in 2015–2023. Measure the entire site on hot days, then replay the actual duty. These are model outputs.
What is the maximum monthly rent I can pay?
Start with invoices for the diesel service you can actually avoid. Record who buys fuel, included hours and swap cover. Deduct solar mobilisation, site work, exit costs and any extra annual service-credit exposure. Divide the discounted difference by discounted billed months. Compare outright purchase with the secured concession term and a documented residual or transfer value.
Pilot and handover
Bring the permit class, rear dimensions and orientation, timed light readings, diesel hour meter and invoices. During the pilot retain an agreed rescue source. Compare delivered campaign hours at the same brightness, test connection loss and next-day recharge, and sign the responsibility matrix before removing diesel.
Calculate my site and rental terms
